当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The goal of Level 2 maintenance is to maintain the highest possible level of availability. Operating site maintenance activities are extended to the repair of subassemblies, modules and LRUs after their replacement at maintenance Level 1. Testing on test-benches or integration tests could be performed. Subsequently, Le是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The goal of Level 2 maintenance is to maintain the highest possible level of availability. Operating site maintenance activities are extended to the repair of subassemblies, modules and LRUs after their replacement at maintenance Level 1. Testing on test-benches or integration tests could be performed. Subsequently, Le
问题补充:

  • 匿名
2013-05-23 12:21:38
2级维护的目标是保持可用性的最高水平。
  • 匿名
2013-05-23 12:23:18
第2级维护的目标是维护可及性的最高水平。在他们的在测试在试验台或综合测试的维护第1.级的替换可能执行后,经营的站点维护活动延伸到组作、模块和LRUs修理。随后,第2级维护可以执行任一个开关产品。
  • 匿名
2013-05-23 12:24:58
第2级维护的目标是维护可及性的最高水平。 经营的站点维护活动延伸到组作、模块和LRUs修理在他们的替换以后在维护第1级。 试飞在试验台或综合测试能将执行。 随后,第2级维护可以执行在或产品。
  • 匿名
2013-05-23 12:26:38
级别 2 维护的目的是可用性的要保持最高程度。经营网站维护活动扩展到子组件、 模块和 LRUs 修复后其更换,维护级别 1。可以执行测试长凳上测试或集成测试。随后,可以打开或关闭产品执行级别 2 维护。
  • 匿名
2013-05-23 12:28:18
2 级维护的目标是维持可用性的最高可能的水平。操纵地点维护活动被延伸到组件部件,模块和 LRUs 的维修在他们的维护 1 级的替代之后。在测试长凳或集成测试上检查可以被实行。随后, 2 级维护可以被实行也上或从产品。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭