|
关注:1
2013-05-23 12:21
求翻译:some of the workers do not competent for the borehole ground source heat pump system operation, nowadays, some of the workers can not operate the system according to the building heating load or cooling load, especially in the condition of peak load. Normally, the auxiliary equipments should be operated under the peak 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
some of the workers do not competent for the borehole ground source heat pump system operation, nowadays, some of the workers can not operate the system according to the building heating load or cooling load, especially in the condition of peak load. Normally, the auxiliary equipments should be operated under the peak
问题补充: |
|
2013-05-23 12:21:38
一些工人不称职的钻孔地源热泵系统的运行,如今,根据建筑热负荷或制冷负荷部分工人无法操作该系统,特别是在高峰负荷的情况。
|
|
2013-05-23 12:23:18
某些工作者没有能干为钻孔研来源热泵系统操作,现今,某些工作者不可能根据大厦热负荷或冷却的装载操作系统,特别是在最大负荷的情况。通常,应该在最大负荷情况下管理辅助器材。
|
|
2013-05-23 12:24:58
某些工作者没有能干为钻孔研来源热泵系统操作,现今,某些工作者不可能根据大厦热负荷或冷却的装载操作系统,特别是在最大负荷的情况。 通常,应该在最大负荷情况下管理辅助器材。
|
|
2013-05-23 12:26:38
一些工人做不胜任的钻孔地面源热泵系统操作,如今,一些工人不可以操作该系统按建筑物热负荷或冷负荷,特别是在峰值负载的情况。通常情况下,辅助设备应在峰值负载条件下运作。
|
|
2013-05-23 12:28:18
一些工人不称职对 borehole 地来源热泵系统操作,目前,一些工人不根据建造加热负荷可以操纵系统或使负荷变冷,尤其在高峰负荷的条件中。通常,辅助的设备应该在高峰负荷条件下被操纵。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区