|
关注:1
2013-05-23 12:21
求翻译:lines record the wavefield along and ahead of the tunnel. In order to simulate the tunnel construction progress, both the tunnel working front and the source position are shifted by 2m foreach shot towardthe wedge. Thefirstsimulationstarts with a tunnel face-to-fault 1 distance of 40 m. In the course of the simulated t是什么意思? 待解决
悬赏分:1
- 离问题结束还有
lines record the wavefield along and ahead of the tunnel. In order to simulate the tunnel construction progress, both the tunnel working front and the source position are shifted by 2m foreach shot towardthe wedge. Thefirstsimulationstarts with a tunnel face-to-fault 1 distance of 40 m. In the course of the simulated t
问题补充: |
|
2013-05-23 12:21:38
线沿线和未来的隧道记录波场。
|
|
2013-05-23 12:23:18
线记录wavefield沿和在隧道前。为了模仿隧道建筑进展,隧道运作的前面和来源位置转移根据2m foreach射击towardthe楔子。与隧道面孔对缺点1距离的Thefirstsimulationstarts 40 m.被模仿的隧道建筑其间,隧道击穿第一个结石学界限(fault1)和方法第二个缺点。
|
|
2013-05-23 12:24:58
线记录wavefield沿和在隧道之前。 为了模仿隧道建筑进展,隧道运作的前面和来源位置转移根据2m foreach射击towardthe楔子。 Thefirstsimulationstarts以隧道面孔对缺点1距离40 m。 被模仿的隧道建筑其间,隧道击穿第一个结石学界限 (fault1) 并且接近第二个缺点。 为每射击,我们以后提取一台唯一接收器以恒定的垂距2m并且获得射击接收器对一个综合性数据集移动与隧道面孔的 (。 2).
|
|
2013-05-23 12:26:38
行记录沿和隧道前声场的路径。为了模拟隧道施工进度,由 2 m foreach 射直奔楔转移的隧道工作前面和源位置。Thefirstsimulationstarts 与隧道工作面断层 1 距离 40 米。模拟的隧道施工过程中隧道击穿的第一个岩边界 (fault1) 和方法的第二次故障。为每次拍摄我们稍后提取单个接收器具有恒定偏移量的 2 m 和获得合成数据集的射击接收器对移动的隧道脸 (图 2)。
|
|
2013-05-23 12:28:18
沿着记录排成行 wavefield 向前和在隧道之前。要模拟隧道建造进展,操纵前面的隧道和来源位置被二百万 foreach 把被射死的 towardthe 楔移动。具有一条隧道的 Thefirstsimulationstarts 40 米的脸到错误 1 段距离。在被模拟的隧道建造期间,隧道穿透第一岩石学的边界 (fault1) 和方法第二个错误。对每射击,我们过后以二百万的持续偏置提取单个的接收者和获取一个合成数据带着隧道表情移动的射手接收者一套的对 ( 无花果。2).
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区