求翻译:Below sharing is from CN facility team refer to flooring cost(766k) for SFM project and current facade & canopy repairing cost(1.1m). We get the conformation that both of these cost will back to store CRE. Since all of them are non-budgeted in FY14, Holly did checked with Clara regard to OIB measurement issue and waiti是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Below sharing is from CN facility team refer to flooring cost(766k) for SFM project and current facade & canopy repairing cost(1.1m). We get the conformation that both of these cost will back to store CRE. Since all of them are non-budgeted in FY14, Holly did checked with Clara regard to OIB measurement issue and waiti