|
关注:1
2013-05-23 12:21
求翻译:Pre-stressed Zhang La requests according to the design to achieve the concrete intensity 100%, after congeals the time not to be smaller than 7 day to pull.The pre-stressed must the bilateral symmetry to carry on, not balanced ties most greatly cannot surpass 1 bunch, opens pulls the order to have to carry on according是什么意思?![]() ![]() Pre-stressed Zhang La requests according to the design to achieve the concrete intensity 100%, after congeals the time not to be smaller than 7 day to pull.The pre-stressed must the bilateral symmetry to carry on, not balanced ties most greatly cannot surpass 1 bunch, opens pulls the order to have to carry on according
问题补充: |
|
2013-05-23 12:21:38
根据实现的具体强度100%的设计预应力章蓝请求,后凝时间应不小于第7天到pull.The预应力必须的双边对称性进行的,不均衡的关系最大幅度不能
|
|
2013-05-23 12:23:18
预应力
|
|
2013-05-23 12:24:58
预应力的张La请求根据设计达到具体强度100%,以后7天凝结时候不小于拉扯。预应力的必需继续的两侧对称,没平衡的领带不可能很大地超过1束,打开拉扯命令必须根据设计纸请求继续。基本双方张La压缩机导线领带在黄河维护预应力的过程区南部双方伸长一致。在建筑之前,应该丢失,提的部分摩擦阻力损失,并且船锚嘴摩擦阻力损失到通道摩擦阻力继续实际决心。
|
|
2013-05-23 12:26:38
预应力的张拉要求按设计的混凝土强度达到 100%,之后凝结时间不能小于 7 天拉。预应力必须进行双边对称、 不平衡的关系最大不能超过 1 群、 张拉顺序,必须根据设计文件要求进行。这两个边张拉压缩机线的关系基本上以南黄河维修的预应力的过程地区两面断裂伸长率一致。施工前应失去,拉削节摩擦阻力损失和对实际测定通道摩擦阻力进行锚口摩阻损失。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区