|
关注:1
2013-05-23 12:21
求翻译:When is the concrete, by the scene construction person in charge estimated goes against error which, ledger wall concrete thickness produces, on the other hand is the error which produces by the template distortion and the concrete bulk specific gravity change.The concrete ultra side and linear has certain influence to是什么意思?![]() ![]() When is the concrete, by the scene construction person in charge estimated goes against error which, ledger wall concrete thickness produces, on the other hand is the error which produces by the template distortion and the concrete bulk specific gravity change.The concrete ultra side and linear has certain influence to
问题补充: |
|
2013-05-23 12:21:38
当是混凝土,由现场施工负责人估计违背其中,底板混凝土厚度产生误差,另一方面是生产由模板变形和混凝土体积比重change.The混凝土超侧和错误
|
|
2013-05-23 12:23:18
就在那个时候; 在...的时候
何时, 什么时候
时间
|
|
2013-05-23 12:24:58
当是混凝土时,由估计的场面建筑人负责去反对另一方面,总帐墙壁具体厚度生产,是错误由模板畸变和具体毛体积比重变动生产的错误。超混凝土边和线性大规模有某一影响对连续的桥梁建筑阶段endogenic力量,当双方特别地出现不是平衡的超边时,影响。当结构托架延长时,危害急剧成长。
|
|
2013-05-23 12:26:38
当是混凝土,由负责人估计现场施工人去反对错误产生,分类帐墙混凝土厚度,在另一只手是由模板变形和大体积混凝土比重变化所产生的错误。混凝土超侧和线性已连续桥施工阶段内力,对某些影响时特别双方出现不平衡超边,在一个大的方法的影响。当结构支架伸长时,损害急剧增长。
|
|
2013-05-23 12:28:18
当是混凝土,通过被估计的负责的场景建造人违反错误那,分类帐墙混凝土厚度生产,另一方面是在模板失真旁边生产的错误和具体容积比重 change.The 混凝土过激论者边和线性到连续桥建造阶段有确定的影响内基因的力量,当特别地双方不似乎是被平衡的极端的边,影响在一大的 way.When 中结构括号拉长,损害尖锐成长。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区