求翻译:Major structural work has been found to be needed at such locations. In at least one building, the Rialto Project, Melbourne, the structural engineer found it necessary to vertically pre-stress the lower height columns so as to reconcile the differential deflections of columns in close proximity with the post-tensionin是什么意思?![]() ![]() Major structural work has been found to be needed at such locations. In at least one building, the Rialto Project, Melbourne, the structural engineer found it necessary to vertically pre-stress the lower height columns so as to reconcile the differential deflections of columns in close proximity with the post-tensionin
问题补充: |
|
2013-05-23 12:21:38
主要结构工程已发现需要在这样的位置。
|
|
2013-05-23 12:23:18
主要结构性工作发现在这样地点必要。在至少一修造, Rialto项目,墨尔本,发现必要垂直预加应力更低的高度专栏以便和解专栏的有差别的偏折在几乎接近的与更短的专栏的后张模仿重量的结构工程师将增加到毗邻,更高的专栏。
|
|
2013-05-23 12:24:58
主要结构工作被发现必要在这样地点。 在至少你修造, Rialto项目,墨尔本,发现了它必要垂直预加应力更低的高度专栏以便和解专栏的有差别的偏折以岗位拉紧更短的专栏模仿重量的结构工程师在接近的接近度将增加到毗邻,更高的专栏。
|
|
2013-05-23 12:26:38
主要结构工作现已发现需要在这样的位置。墨尔本,Rialto 项目中,至少一栋楼里,结构工程师发现必要垂直前强调,以调和微分挠曲的接近的接近度中的列的模拟的重量要添加到相邻、 较高的列的短列的后张法预应力的较低高度列。
|
|
2013-05-23 12:28:18
主要结构的工作被找到了在这样的定位需要。在至少一座建筑物, Rialto 项目,墨尔本,结构工程师发现它有必要纵向给更低的高度栏预加应力以使栏的差额的偏角和谐以模拟被添加的重量的更简短专栏的 tensioning 后在附近相邻,更高的栏。
|