当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:All projects need to qualify for points a, b, c & d. Points e, f, g and h are also positive for small projects, but not compulsory like they are for bigger projects. The maximum total budget for a small project is 500 000 RMB and should be carried out over 2 to 4 years. As point c and d emphasize, all projects need to 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
All projects need to qualify for points a, b, c & d. Points e, f, g and h are also positive for small projects, but not compulsory like they are for bigger projects. The maximum total budget for a small project is 500 000 RMB and should be carried out over 2 to 4 years. As point c and d emphasize, all projects need to
问题补充:

  • 匿名
2013-05-23 12:21:38
所有的项目都需要有资格获得点a,b , c及d 。
  • 匿名
2013-05-23 12:23:18
所有项目需要在点a, b, c合格& D.点e、f、g和h也是正面为小项目,但是不强制,如他们是为更大的项目。一个小项目的最大总预算是500 000个RMB,并且应该在2到4年期间执行。当点c和d强调,所有项目需要有地方贡献的某种形式,以便恩人开发归属对项目。
  • 匿名
2013-05-23 12:24:58
所有项目需要在点a、b、c & d.合格。 指向e, f, g和h也是正面为小项目,但不必修,如他们是为更大的项目。 最大总预算为一个小项目是500 000 RMB,并且应该执行在2到4年期间。 当点c和d强调,所有项目需要有地方贡献的某种形式,以便恩人开发归属到项目。
  • 匿名
2013-05-23 12:26:38
所有项目都需要限定为点 a、 b、 c & d.点 e、 f、 g 和 h 也是积极的小型项目,但不是像他们是为更大的项目是强制性。一个小项目的预算总额最高 500 元人民币的应进行 2 到 4 年以上。作为点 c 和 d 强调,所有的项目需要有某种形式的地方作出的贡献,以便恩人发展到该项目的所有权。
  • 匿名
2013-05-23 12:28:18
都项目需要符合点的条件, b, c 和 d。点 e, f, g 和 h 也为小项目是肯定的,但是不义务喜欢他们为更大的项目的。用于一个小项目的最大总预算是 500 000 RMB 和应该超过 2 至 4 年被执行。当 c 和 d 强调的点都预计有某种形式的本地贡献的需要,以便赞助人发展一个所有权到项目。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭