|
关注:1
2013-05-23 12:21
求翻译:To optimize the bridge configuration, to reduce the peak moment value at supports, and to minimize the constructional depth of girders, V-shaped or Y-shaped piers are developed for prestressed concrete continuous beam, cantilever, or rigid frame bridges. The prominent examples are the Zhongxiao Bridge (1981) in Taiwan 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
To optimize the bridge configuration, to reduce the peak moment value at supports, and to minimize the constructional depth of girders, V-shaped or Y-shaped piers are developed for prestressed concrete continuous beam, cantilever, or rigid frame bridges. The prominent examples are the Zhongxiao Bridge (1981) in Taiwan
问题补充: |
|
2013-05-23 12:21:38
为了优化桥配置,以减少峰值力矩值的支持,并尽量减少梁的构造深度, V形或Y形桥墩被开发为预应力混凝土连续梁,悬臂,或刚构桥。
|
|
2013-05-23 12:23:18
要优选桥梁配置,减少高峰片刻价值在支持和使大梁减到最小的建设深度, V形或Y字形的码头为钢筋混凝土连续的射线、悬臂或者刚性框架桥梁被发展。突出的例子是中小镇Bridge (1981)在台湾省和丽江Bridge (1987)在芝山在市桂林。
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
正在翻译,请等待...
|
|
2013-05-23 12:28:18
优化桥配置,在支持减少高峰时刻价值,将梁的构造的深度减到最少, V 成型座或者 Y 形状的码头为预拉伸具体连续横梁,悬梁,或严格的框架被开发建桥梁。杰出的榜样是 Zhongxiao 桥 (1981 年 ) 在台湾省和 Lijiang 桥 (1987 年 ) 在桂林的城市的 Zhishan。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区