当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Huanglingji Bridge (Figure 63.16), located in Hanyang County, Hubei Province, is a prestressed concrete truss T-frame highway bridge. It has spans of 7 × 20 + 53 + 90 +53 + 2 × 20 m, with a total length of 380.19 m. The 90-m-long main span is composed of two cantilever arms of 37 m each and a 16-m-long suspended span.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Huanglingji Bridge (Figure 63.16), located in Hanyang County, Hubei Province, is a prestressed concrete truss T-frame highway bridge. It has spans of 7 × 20 + 53 + 90 +53 + 2 × 20 m, with a total length of 380.19 m. The 90-m-long main span is composed of two cantilever arms of 37 m each and a 16-m-long suspended span.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
Huanglingji桥梁(图63.16),位于汉阳县,湖北,是一座钢筋混凝土捆T型框架高速公路桥梁。它有间距7 × 20 + 53 + 90 +53 + 2 × 20 m,与一总长的380.19 m。90 m长的主要间距由37 m和每个一个16 m长的暂停的间距的两条悬臂式胳膊组成。
  • 匿名
2013-05-23 12:24:58
Huanglingji桥梁 (图63.16),位于Hanyang县,湖北省,是一座钢筋混凝土捆T型框架高速公路桥梁。 它有间距7 × 20 + 53 + 90 +53 + 2 × 20 m,以一个总长度的380.19 m。 90 m长的主要间距由37 m和每个一个16 m长的暂停的间距的二条悬臂式胳膊组成。
  • 匿名
2013-05-23 12:26:38
黄陵矶大桥 (图 63.16),位于湖北省汉阳县是预应力混凝土桁架 T 形刚构公路大桥。它具有跨度为 7 × 20 + 53 + 90 + 53 + 2 × 20 m,总长度为 380.19 m。90 米长的主桥是由两个悬臂武器 37 m 每个和 16 米长的悬浮的跨度组成。
  • 匿名
2013-05-23 12:28:18
Huanglingji 桥 ( 图 63.16),位于 Hanyang 县,湖北省,是一预拉伸具体 truss T 框架高速公路桥。有 7 x 20 + 53 + 90 +53 + 2 的一段时间 x 20 米,以 380.19 米的总长。90-m-渴望主要距离由两个悬梁组成 37 米的备战每个和一段 16-m-渴望悬吊的距离。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭