|
关注:1
2013-05-23 12:21
求翻译:For instance, during a heating period, when transitioning from a lower temperature at night to the desired daytime operating temperature, it is necessary to “charge” the large thermal capacitance of the building in order to reach the desired daytime temperature.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
For instance, during a heating period, when transitioning from a lower temperature at night to the desired daytime operating temperature, it is necessary to “charge” the large thermal capacitance of the building in order to reach the desired daytime temperature.
问题补充: |
|
2013-05-23 12:21:38
例如,在加热期间,从夜间较低的温度转变到所希望的白天的工作温度时,它是必要的“充电”建筑的大的热容量,以达到所需的白天温度。
|
|
2013-05-23 12:23:18
例如,在热化期间,当转折从低温在晚上对期望白天操作温度, “充电”为了到达期望白天温度时的修造的大热量电容是必要的。
|
|
2013-05-23 12:24:58
例如,在热化期间,当transitioning从低温在晚上到期望白天操作温度, “充电”大厦的大热量电容为了到达期望白天温度时是必要的。
|
|
2013-05-23 12:26:38
例如,在一个采暖期,期间在转换时从较低的温度在晚上到所需的白天运行温度,有必要建设大热电容"收取"以达到所需的白天温度。
|
|
2013-05-23 12:28:18
例如,在 transitioning 时的从一更低的温度的一段加热时期期间在晚上到操纵温度的所需白天,它有必要“起诉”建筑物的大热电容以到达所需白天温度。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区