|
关注:1
2013-05-23 12:21
求翻译:Excavating pits for column footings and lift pit from existing ground level, in any material met with except rock requiring blasting. Part return fill rammed and well consolidated. Rate shall include for any temporary supports compacting and leveling bottom where required in the following.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Excavating pits for column footings and lift pit from existing ground level, in any material met with except rock requiring blasting. Part return fill rammed and well consolidated. Rate shall include for any temporary supports compacting and leveling bottom where required in the following.
问题补充: |
|
2013-05-23 12:21:38
挖掘坑柱底座和升降坑从现有的地面水平,除了岩石需要爆破遇到的任何材料。
|
|
2013-05-23 12:23:18
挖掘为柱底脚和推力坑挖坑从现有的底层,在任何材料与除了要求炸开的岩石回面。部分被猛撞和很好巩固的回归积土。率为哪里需要变紧密和成水平底部在以下的所有临时支持将包括。
|
|
2013-05-23 12:24:58
挖掘的坑为柱底脚和推力坑 从现有的底层,在任何材料与除了要求炸开的岩石回面。 部分被猛撞和很好巩固的回归积土。 率为哪里需要变紧密和成水平底部在以下的所有临时支持将包括。
|
|
2013-05-23 12:26:38
挖掘坑为柱脚和电梯坑从现有的地面水平,在任何材料中会见了除了需要爆破的岩石。一部分返回填充撞向和很好的整合。率应包括为任何临时支持压缩和调配底凡在以下所需。
|
|
2013-05-23 12:28:18
为栏挖掘坑 地位和升力坑从现有地水平的 ,在任何材料碰到具除需要进行爆破的岩石外。部分返回充满猛撞和好地巩固。比率将包括对压缩和平整最后的 的任何临时支持哪里在以下内容中要求。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区