当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:You are right, the relocation of the IT-cable ladder was necessary in preparation of 60u technological installations in future. All these matters will be handled by BBT-74-T supported by C3. As far as such works are not indicated in the design documents C3 is collecting them and after a certain time BBT-74-T will issue是什么意思?

待解决 悬赏分:1 - 离问题结束还有
You are right, the relocation of the IT-cable ladder was necessary in preparation of 60u technological installations in future. All these matters will be handled by BBT-74-T supported by C3. As far as such works are not indicated in the design documents C3 is collecting them and after a certain time BBT-74-T will issue
问题补充:

  • 匿名
2013-05-23 12:21:38
你是对的,在IT电缆梯的搬迁是必要的准备60U的技术设施在未来的。
  • 匿名
2013-05-23 12:23:18
您是权利,它缆绳梯子的拆迁是必要的在60u技术设施的准备今后。所有这些事态将由C3支持的BBT-74-T处理。象这样工作在设计文件C3没有被表明一样收集他们,并且,在有些时光BBT-74-T将相应地后发布一个哥斯达黎加。关于进一步细节请与从C3的Fa东联系。
  • 匿名
2013-05-23 12:24:58
您是权利,它缆绳梯子的拆迁是必要的在60u技术设施的准备今后。 所有这些事态将由C3支持的BBT-74-T处理。 只要这样工作在设计文件C3没有被表明收集他们,并且,在有些时光BBT-74-T将相应地之后发布一个哥斯达黎加。 为进一步细节请联络Fa东从C3。
  • 匿名
2013-05-23 12:26:38
你是对的搬迁的 IT 电缆梯子时是有必要在将来 60u 技术装置的研制。所有这些问题都将由 BBT-74-T 支持 C3 的处理。据此类作品中未标明设计文档 C3 加以收集和后一段时间 BBT-74-T 将据此发出 CR。更多详细信息请联系 Fa 董从 C3。
  • 匿名
2013-05-23 12:28:18
你正确, IT 电缆的梯子的重新安置在 60u 的筹备中是必要的未来的技术安装设备。所有这些事情将被 BBT-74-T 处理支持通过 C3。就这样的工作不在设计文件 C3 中被表示而言在收集他们和某个时间的 BBT-74-T 相应地将发行一 CR 后。对详情请从 C3 联系 Fa Dong。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭