|
关注:1
2013-05-23 12:21
求翻译:Every node maintains an estimate of the cost of its route to a collection point. We assume expected transmissions(ETX) as the cost metric, but any similar gradient metric can work just as well. A node’s cost is the cost of its next hop plus the cost of its link to the next hop: the cost of a route is the sum of the cos是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Every node maintains an estimate of the cost of its route to a collection point. We assume expected transmissions(ETX) as the cost metric, but any similar gradient metric can work just as well. A node’s cost is the cost of its next hop plus the cost of its link to the next hop: the cost of a route is the sum of the cos
问题补充: |
|
2013-05-23 12:21:38
每个节点维护其路由到集合点的成本估计值。
|
|
2013-05-23 12:23:18
每个结维护它的路线的费用的估计对汇集点。我们假设期待传输(ETX)作为公尺的费用,但是公尺所有相似的梯度可能运作。结的费用是它的下棵蛇麻草的费用加上它的链接的费用对下棵蛇麻草:路线的费用是它的链接的费用的总和。汇集点给一费用的零做广告。
|
|
2013-05-23 12:24:58
每个结维护它的路线的费用的估计对汇集点。 我们假设期待传输(ETX) 作为费用公尺,但所有相似的梯度公尺罐头运转。 结的费用是它的下棵蛇麻草的费用加上它的链接的费用对下棵蛇麻草: 路线的费用是它的链接的费用的总和。 汇集点给一费用的零做广告。
|
|
2013-05-23 12:26:38
每个节点都维护其路由到集合点的成本的估计。我们假设预期的 transmissions(ETX) 作为成本度量,但任何类似的梯度度量可以好工作。节点的成本是其下一跃点的费用再加上其链接到下一个跃点的成本: 成本的一条路线是其链接的成本的总和。集合点广告成本为零。
|
|
2013-05-23 12:28:18
每个节点维持其到收集点的路线的费用的一个估计。我们任职被期待的 transmissions(ETX) 随着费用公制,但是任何类似斜度公制可以也好工作。一个节点的费用加上是其下一个蛇麻草的费用其与下一个蛇麻草的联系的费用:一条路线的费用是其联系的费用的总和。收集指为零的一笔费用做广告。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区