当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Highway construction started late in China, however, technology reserve is insufficient, technical force of highway engineering construction standard and construction quality, is not ideal, and durability of highway asphalt pavement early damage and shortage has become a road of healthy development of the outstanding p是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Highway construction started late in China, however, technology reserve is insufficient, technical force of highway engineering construction standard and construction quality, is not ideal, and durability of highway asphalt pavement early damage and shortage has become a road of healthy development of the outstanding p
问题补充:

  • 匿名
2013-05-23 12:21:38
高速公路建设起步较晚,然而,中国的技术储备是公路工程建设标准和施工质量不足,技术力量雄厚,是不理想的,和高速公路沥青路面早期损坏和短缺的耐久性已成为突出问题健康发展之路
  • 匿名
2013-05-23 12:23:18
在中国晚了开始的高速公路建筑,然而,技术储备是高速公路工程学建筑标准和建筑质量不足,技术力量,不是理想的,并且高速公路沥青路面早期的损伤和短缺的耐久性在我们的国家成为了卓著的问题的健康发展路。
  • 匿名
2013-05-23 12:24:58
高速公路建造晚在中国开始,然而,技术储备是不足的,高速公路工程建造标准和建筑业质量的技术力量,不是理想的,高速公路沥青人行道的耐久性早的损害和缺乏成为我们的国家中的杰出的问题的健康的发展的一条路。
  • 匿名
2013-05-23 12:26:38
公路建设起步晚在中国,然而,技术储备是公路工程建设标准的不足、 技术力量和施工质量,是不理想的和耐久性的公路沥青路面早期损坏和短缺已成为悬而未决的问题在我国的健康发展之路。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭