|
关注:1
2013-05-23 12:21
求翻译:will have to be extended by about 30-40 cm in order to allow us to run the cable across the top of the motor (fixation on the cable pull relief) and route it through the bed to the pull relief welded to the head end frame of the bed.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
will have to be extended by about 30-40 cm in order to allow us to run the cable across the top of the motor (fixation on the cable pull relief) and route it through the bed to the pull relief welded to the head end frame of the bed.
问题补充: |
|
2013-05-23 12:21:38
将必须由约30-40厘米,以使我们能够在整个电机(固定在电缆上拉浮雕) ,并将其路由通过床来拉救济焊接头端框架的顶部运行电缆延长
|
|
2013-05-23 12:23:18
将必须由大约30-40 cm延伸为了允许我们跑横跨马达(在缆绳拉扯安心的定象的)上面的缆绳和通过床寻址它到被焊接的拉扯安心到床的首部结尾框架。
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
正在翻译,请等待...
|
|
2013-05-23 12:28:18
将必须被大约 30-40 厘米延伸以允许我们横跨马达的顶部运行电报 ( 电缆拉解除上的定置 ) 和通过对于拉解除的床传送它焊接到床的头的终止框架。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区