当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The model is then detailed, and construction drawings are developed. All drawings are submitted to the engineering department for approvals prior to fabrication. Drawings are updated as changes are made. At the end of the project, a full set of “as built” drawings is finalized and distributed to the client.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The model is then detailed, and construction drawings are developed. All drawings are submitted to the engineering department for approvals prior to fabrication. Drawings are updated as changes are made. At the end of the project, a full set of “as built” drawings is finalized and distributed to the client.
问题补充:

  • 匿名
2013-05-23 12:21:38
该模型然后详细介绍,以及施工图纸的开发。
  • 匿名
2013-05-23 12:23:18
模型然后详述,并且结构图被开发。所有图画递交给工程部为获得批准在制造之前。更新图画变动做。在项目结束时,全套“被修造的”图画被完成并且被分布给客户。
  • 匿名
2013-05-23 12:24:58
模型然后详述,并且结构图被开发。 所有图画递交给工程部为获得批准在制造之前。 更新图画和变动做。 在项目的结尾,全套“被修造的”图画被完成并且被分布对客户。
  • 匿名
2013-05-23 12:26:38
然后详细的模型,并给出施工图纸。所有图纸都提交审批前制造工程部。在更改更新图纸。在项目的最后,一套"作为建"图纸是最后定稿并分发给客户端。
  • 匿名
2013-05-23 12:28:18
模型然后被详细说明,建造素描被发展。所有素描为在装配工之前的审批被提交给设计部门。素描被更新由于变化被做出。在项目之末,全套“当被建造”素描跟客户被完成和分散。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭