|
关注:1
2013-05-23 12:21
求翻译:4. An inadequate test may not make it known that some additional scope items may be necessary for the process equipment system to function as desired (i.e., a proper test may shed light on some things that should have been included in the initial URS).是什么意思? 待解决
悬赏分:1
- 离问题结束还有
4. An inadequate test may not make it known that some additional scope items may be necessary for the process equipment system to function as desired (i.e., a proper test may shed light on some things that should have been included in the initial URS).
问题补充: |
|
2013-05-23 12:21:38
4,一个不足的测试可能不会让他们知道一些额外的范围,项目可能是必要的工艺设备系统,按需要的(例如,一个适当的测试,可能对一些事情,应该已经包含在初始URS光) 。
|
|
2013-05-23 12:23:18
4. 一个不充分的测试可能不传达它一些另外的范围项目也许是必要为了处理设备系统能起作用正如渴望(即,一个适当的测试也许显示在最初的乌尔斯应该包括)的有些事的清楚。
|
|
2013-05-23 12:24:58
4. 一个不充分的测试可能不传达它一些另外的范围项目也许是必要为处理设备系统功能作为渴望 (即,一个适当的测试也许显示清楚在最初的URS应该包括的有些事)。
|
|
2013-05-23 12:26:38
4.不足的测试不会使其已知的一些额外范围项目可能是必要的工艺设备系统要发挥应有的作用 (即,一个合适的测试可能揭示应列入初始 URS 一些事情)。
|
|
2013-05-23 12:28:18
4.一次不足的测试不能使其变得已知的那一些其他的范围条款可能对过程设备系统必要如有必要起作用 ( 即,一次正确测试可能清楚显示应该被包括最初 URS 在内了的一些事情 )。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区