求翻译:For a long time, construction cost control of the preliminary engineering of project construction has been ignored in China, while the primary energy of controlling construction cost has been focused upon auditing working drawing estimate, settling construction cost and settling itemized account during construction. Al是什么意思?

待解决 悬赏分:1 - 离问题结束还有
For a long time, construction cost control of the preliminary engineering of project construction has been ignored in China, while the primary energy of controlling construction cost has been focused upon auditing working drawing estimate, settling construction cost and settling itemized account during construction. Al
问题补充:

  • 匿名
2013-05-23 12:21:38
长期以来,项目建设的前期工程施工成本控制已被忽略,在中国,同时控制工程造价的主要精力都集中在审核施工图预算,工程结算成本和施工期间沉降流水帐。
  • 匿名
2013-05-23 12:23:18
长期地,而控制造价主要能源被聚焦了在验核加工图估计,安定的造价和安定被分条列述的帐户在建筑时,项目建筑初步工程学的造价控制在中国被忽略了。虽然这有它的作用,终究这没有从采取防备措施的区别在两次遭受损失和得到一半以后结果用努力。
  • 匿名
2013-05-23 12:24:58
长期,而控制建筑费主要能源被聚焦了在验核加工图估计,安定的建筑费和安定被分条列述的帐户在建筑期间,项目建筑初步工程学的建筑费控制在中国被忽略了。 虽然这有它的作用,终究这没有区别从采取防备措施在两次遭受损失和得到一半以后结果以努力。 为了有效地控制建筑费,应该牢固地转移控制重点到初步建筑阶段。 当前,我们应该采取所有痛苦掌握这个重大阶段以便达到最大结果以一点努力。
  • 匿名
2013-05-23 12:26:38
对于很长时间,施工成本控制的项目建设的初步工程已忽略在中国,虽然审计工作绘图估计、 沉降工程造价和施工过程中沉降明细账所聚焦的工程造价控制的主要能源。虽然这其影响,毕竟,这有没有采取防范措施后遭受损失,得到两倍的努力的一半结果的差异。为了有效地控制建设成本,控制的重点应该坚定地转入初步建设阶段。目前,我们应该采取所有痛苦把握这个重要的阶段,从而达到最大结果数与小努力。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭