求翻译:The normal laying procedure is based on the fact that all the pipes will be built on board of the vessel from the storage to the final laying on the seabed. The vessel is fully equipped with a crane of WLL 400 T in order to load the pipes on the deck, pipe transported by Mecor on dedicated cargo barge. The pipes of ab是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The normal laying procedure is based on the fact that all the pipes will be built on board of the vessel from the storage to the final laying on the seabed. The vessel is fully equipped with a crane of WLL 400 T in order to load the pipes on the deck, pipe transported by Mecor on dedicated cargo barge. The pipes of ab
问题补充:

  • 匿名
2013-05-23 12:21:38
正常的铺设过程是基于这样的事实,所有的管道将被建立在容器中的电路板,从存储到海床上的最终敷设。
  • 匿名
2013-05-23 12:23:18
正常放置的做法根据事实所有管子在船上将被修造从存贮的船到最后放置在海底。船是全副武装与WLL起重机400 T为了装载管子在甲板,用管道输送运输由在热忱的货物驳船的Mecor。管子大约十二米长度将跟随以后被描述的建筑序列:
  • 匿名
2013-05-23 12:24:58
正常放置的做法根据事实所有管子在船上将被修造船从存贮到最后放置在海底。 船在甲板在热忱的货物驳船充分地装备WLL起重机400 T为了装载管子,用管道输送由Mecor运输。 管子大约十二米长度将跟随以后被描述的建筑序列:
  • 匿名
2013-05-23 12:26:38
正常的铺设程序是船只的基于事实,所有的管道将建于董事会从存储到最后躺在海床上。这艘船是配备了一台起重机的 WLL 400 T 为了装载在甲板上,管道专用的货运驳船上由 Mecor 运输管道。十二米左右长度的管子将遵循以下所述的施工顺序:
  • 匿名
2013-05-23 12:28:18
正常放程序依据所有烟斗将被建造的事实有从存储到掉在海底的决赛的船。船完全配备 WLL 的一台起重机 400 T 以在甲板装载烟斗,在专用的货物驳船上被 Mecor 运送的烟斗。长度的大约十二米的烟斗将沿着在下文被描述的建造顺序:
 
 