|
关注:1
2013-05-23 12:21
求翻译:All the riggers, field engineer, quality and safety control resources on board of the vessel will be employed under the supervion of the Superintendent. During this activity also the diving team will be employed in order to check the position and the installation tolerance of the PLEM and, in a second stage to connect 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
All the riggers, field engineer, quality and safety control resources on board of the vessel will be employed under the supervion of the Superintendent. During this activity also the diving team will be employed in order to check the position and the installation tolerance of the PLEM and, in a second stage to connect
问题补充: |
|
2013-05-23 12:21:38
在船上的所有装配工,现场工程师,质量和安全控制资源总监的supervion下使用。
|
|
2013-05-23 12:23:18
所有装配工人、实地工程师、质量和安全控制资源船在船上将被雇用在管理者的supervion下。在这活动期间潜水队也将被雇用为了检查位置和PLEM的设施容忍和,在第二阶段连接基础堆到PLEM结构。
|
|
2013-05-23 12:24:58
所有装配工人、实地工程师、质量和安全控制资源船在船上将被雇用在管理者的supervion之下。 在这活动期间潜水队也将被雇用为了检查位置和PLEM的设施容忍和,在第二阶段连接基础堆到PLEM结构。
|
|
2013-05-23 12:26:38
所有的装配工、 现场工程师、 质量和安全控制船只的船上的资源将受雇警司的合理性。在此活动期间也跳水队会聘用,以检查的位置和安装公差计费,并在第二阶段要连接到的计费结构的桩基。
|
|
2013-05-23 12:28:18
所有索具装配人,现场的工程师,质量和安全在其上的控制资源船中将在管理员的 supervion 下被雇用。在这次活动期间也跳水小组将被使用以在将基础痔疮连接至 PLEM 结构的第二阶段检查位置和 PLEM 的安装忍受。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区