|
关注:1
2013-05-23 12:21
求翻译:I have issued the links for these below, but based on the last testing done on these I would guess these are about due for annual protocol testing. Because we have added the CPSIA evaluation to the protocol you will get a lab issued GCC for these to use on future orders.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
I have issued the links for these below, but based on the last testing done on these I would guess these are about due for annual protocol testing. Because we have added the CPSIA evaluation to the protocol you will get a lab issued GCC for these to use on future orders.
问题补充: |
|
2013-05-23 12:21:38
我已经发出了这些下面的链接,但基于过去的测试对这些做我猜这大概是由于年度协议测试。
|
|
2013-05-23 12:23:18
我下面发布了这些的链接,但是基于在这些做的最后测试我猜测这些为每年协议测试是交付的。由于我们增加了CPSIA评估到协议您将有这些的实验室被发布的GCC在未来命令的用途。
|
|
2013-05-23 12:24:58
我下面发布了链接为这些,但基于在这些做的为时测试我猜测这些为每年协议测试是交付的。 由于我们增加了CPSIA评估到协议您在未来命令将有实验室被发布的GCC为这些用途。
|
|
2013-05-23 12:26:38
我发出链接的有这些下面,但是基于对这些进行最后测试会猜这些是关于适当的年度协议测试。因为我们在协议中加入 CPSIA 评价你会得到实验室颁发 GCC 为这些在今后的订单上使用。
|
|
2013-05-23 12:28:18
我为了这些发行了联系在下边,但是根据在这些完成的最后的测试我会猜这些大约是即将年度协议测试。因为我们将 CPSIA 评估添加至了你将使为了这些被发给其 GCC 的一个实验室在将来订单使用的协议。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区