|
关注:1
2013-05-23 12:21
求翻译:A cross-case analysis including study of the downstream structure, downstream relationship, upstream structure, upstream relationship, production method and inventory position produced a postponement classification into five categories: balanced structure without customer information; customer dominated; manufacturer d是什么意思? 待解决
悬赏分:1
- 离问题结束还有
A cross-case analysis including study of the downstream structure, downstream relationship, upstream structure, upstream relationship, production method and inventory position produced a postponement classification into five categories: balanced structure without customer information; customer dominated; manufacturer d
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
字母A
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
跨案例分析包括下游结构,下游的关系,上游结构,上游的关系的研究、 生产方法和库存位置产生推迟分类分为五类: 平衡结构,没有客户信息 ;客户为主 ;制造商占主导地位 ;与松散的供应商和最后虚拟供应链的平衡的结构。基于这种分类,假设的两个命题: 供应链具有平衡的结构时,它应该使用的猜测或生产推迟。当供应链具有一种不平衡的结构时,它应该使用采购推迟或产品发展延迟。全部推迟被定义为使用订单生产 (MTO) 在制造和集中的库存和直接配送的物流服务相反的充满投机被定义为使用股票使 (MTS) 在物流中的制造业和分散库存。产品延迟是指设计出的产品,产品的具体功能不设直到它收到客户,而在进程推迟,通用部件创建
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区