|
关注:1
2013-05-23 12:21
求翻译:2. By means of the new systems to be installed in Keban, the analogue measurements at every 2 sec. such as the active power of the generators, minimum (MINC) and maximum (MAXC) capacities of the PP (without threshold), the other measured figures at every 10 sec should be sent to Keban Control Center.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
2. By means of the new systems to be installed in Keban, the analogue measurements at every 2 sec. such as the active power of the generators, minimum (MINC) and maximum (MAXC) capacities of the PP (without threshold), the other measured figures at every 10 sec should be sent to Keban Control Center.
问题补充: |
|
2013-05-23 12:21:38
2 ,通过在每2秒将安装在可邦,模拟测量的新系统的手段。
|
|
2013-05-23 12:23:18
2.通过在Keban将安装的新的系统,模式测量每2秒。例如页的发电器、极小值(MINC)和最大(MAXC)容量的活动电源(没有门限),应该送其他被测量的图在每10秒到Keban控制中心。
|
|
2013-05-23 12:24:58
2. 通过在Keban将安装的新的系统,模式测量在每2秒。 例如页的发电器、极小值MINC和 (最大) MAXC容量的 () 活动电源 (没有门限的),应该寄发其他被测量的图在每10秒到Keban控制中心。
|
|
2013-05-23 12:26:38
2.通过对新的系统将安装在昏厥,在每 2 秒,如发电机、 最低的有功功率 (MINC) 和 (没有门槛),PP 最大 (MAXC) 能力上的模拟测量其他测量的数字在每 10 秒应该发送到昏厥控制中心。
|
|
2013-05-23 12:28:18
2.通过在 Keban 中有待安装的新系统,每 2 的模拟度量法节例如发电机的活动力量,最小值 (MINC) 和最大值 (MAXC)PP 的能力 ( 没有阈值地 ),每 10 sec 的其他整齐的数字应该被传送给 Keban Control 中心。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区