|
关注:1
2013-05-23 12:21
求翻译:CESE2 had submitted the onsite temporary facilities which include the fabrication area. If due to the space limitation, the onsite fabrication area cannot meet the production demand, CESE2 shall use this location, which is one block away from the construction site, for piping prefabrication works是什么意思? 待解决
悬赏分:1
- 离问题结束还有
CESE2 had submitted the onsite temporary facilities which include the fabrication area. If due to the space limitation, the onsite fabrication area cannot meet the production demand, CESE2 shall use this location, which is one block away from the construction site, for piping prefabrication works
问题补充: |
|
2013-05-23 12:21:38
CESE2提交了现场临时设施,包括加工区。
|
|
2013-05-23 12:23:18
CESE2递交了包括制造区域的本地临时设施。如果由于空间局限,本地制造区域不可能适应生产需要, CESE2将使用这个地点,是远离建造场所的一个块,为了用管道输送预铸工作
|
|
2013-05-23 12:24:58
CESE2 屈服了现场包括装配工地区的临时设施。如果由于间隔的限制,现场装配工地区不能满足生产需求, CESE2 将使用这个位置,为了吹奏装配工前距建筑工地一街区工作
|
|
2013-05-23 12:26:38
CESE2 提交了现场临时设施,包括制造领域。如果由于空间限制,现场制作区域不能满足生产需求,CESE2 应使用此位置,这是一个街区就施工现场,为管道预制工程
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区