当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The total computation time with CST software is reduced by a factor of 2.6(complete model costs 54 seconds, reduced model costs 21 seconds) and with BLT equation is reduced by a factor of 4.3(complete model costs 0.6 seconds, reduced model costs 0.14 seconds) after equivalence of the complete model by using the method 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The total computation time with CST software is reduced by a factor of 2.6(complete model costs 54 seconds, reduced model costs 21 seconds) and with BLT equation is reduced by a factor of 4.3(complete model costs 0.6 seconds, reduced model costs 0.14 seconds) after equivalence of the complete model by using the method
问题补充:

  • 匿名
2013-05-23 12:21:38
总的计算时间与中科软件减少了2.6倍(完整的模型成本54秒时,降低模型成本21秒)和BLT方程是减少了4.3倍(型号齐全费用0.6秒,降低模型成本0.14秒
  • 匿名
2013-05-23 12:23:18
与CST软件的总计算时间被因素2.6 (完全式样减少花费54秒,减少的模型花费21秒),并且与BLT等式被因素4.3减少(完全式样花费0.6秒,减少的模型花费0.14秒)通过使用ECBM理论,方法在完全模型的相等以后
  • 匿名
2013-05-23 12:24:58
总计算时间与CST软件被因素2.6完全(式样减少花费54秒,减少的模型花费21秒) ,并且与BLT等式被因素4.3完全(式样减少花费0.6秒,减少的模型通过使用ECBM) 理论方法花费0.14秒在完全模型的相等以后
  • 匿名
2013-05-23 12:26:38
总计算时间与 CST 软件通过 2.6 (完成模型成本 54 秒,减少的模型成本 21 秒) 的一个因素和减少与 BLT 方程的 4.3 (完成模型成本 0.6 秒,减少的模型费用 0.14 秒) 的一个因素后的完整的模型等价性使用减少 ECBM 理论的方法
  • 匿名
2013-05-23 12:28:18
有美国中央时区软件的总数的计算时间被减少所作按 2.6 之级数 ( 完整的模型花费 54 秒,减少模型花费 21 秒 ) 和利用 BLT 等式被减少所作按 4.3 之级数 ( 完整的模型花费 0.6 秒,减少模型花费 0.14 秒 ) 在完整的模型的等同之后所作使用 ECBM 理论的方法
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭