当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:6.The procedure of unloading is on the contrary. Firstly, the cargo consolidation is removed. Then blocking the inside of wooden frame with 5MM steel plate and using the wire rope to cover the plate and wooden frame in order pulling together from the inside to unload the cargo smoothly.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
6.The procedure of unloading is on the contrary. Firstly, the cargo consolidation is removed. Then blocking the inside of wooden frame with 5MM steel plate and using the wire rope to cover the plate and wooden frame in order pulling together from the inside to unload the cargo smoothly.
问题补充:

  • 匿名
2013-05-23 12:21:38
卸载6,程序则相反。
  • 匿名
2013-05-23 12:23:18
6.The做法卸载相反是。首先,取消货物实变。然后阻拦木制框架的里面与5MM钢板的和使用钢丝绳报道板材和木制框架按顺序合作从里面的顺利地卸载货物。
  • 匿名
2013-05-23 12:24:58
6.The做法卸载相反是。 首先,取消货物实变。 然后阻拦木制框架的里面用5MM钢板和使用钢丝绳报道板材和木制框架按顺序合作从里面的顺利地卸载货物。
  • 匿名
2013-05-23 12:26:38
6.卸荷过程是相反的。首先,货物合并将被删除。然后阻塞木制框架以 5 毫米厚钢板和用金属丝绳用覆盖板和从里面把拉在一起为了顺利卸载货物的木制框架的里面。
  • 匿名
2013-05-23 12:28:18
卸载的 6.The 程序是相反。首先,货物巩固被撤销。然后阻挡木制的框架有使用电线绳子的 5MM 钢盘子的里面有秩序地包括盘子和木制的框架从里面齐心协力顺利地卸货物。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭