|
关注:1
2013-05-23 12:21
求翻译:The Contractor shall demonstrate to the satisfaction of the Engineer that he has procedures in place to control distortion and contraction so as to achieve these tolerances.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The Contractor shall demonstrate to the satisfaction of the Engineer that he has procedures in place to control distortion and contraction so as to achieve these tolerances.
问题补充: |
|
2013-05-23 12:21:38
承包商应展示给他有适当的程序来控制变形和收缩,从而达到这些公差的工程师满意。
|
|
2013-05-23 12:23:18
承包商将显示出使工程师确信,他有控制的做法适当畸变和收缩以便达到这些容忍。
|
|
2013-05-23 12:24:58
The Contractor shall demonstrate to the satisfaction of the Engineer that he has procedures in place to control distortion and contraction so as to achieve these tolerances.
|
|
2013-05-23 12:26:38
承包商应证明满意的工程师他在控制畸变和收缩从而达到这些公差的地方有的程序。
|
|
2013-05-23 12:28:18
承包商将向工程师的满意证明他在合适的位置有程序控制失真和收缩以完成这些忍耐力。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区