当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Nizhu River Hydropowe Station in Shuicheng, Guizhou,which founded in 2004 and registered capital of RMB 200 million yuan and the total investment of 800 million yuan, installed 136000 kilowatts and year power rate 1,000,000,000 kwh, has porduced the electricity generation in April 2012 and annual profits 100 million yu是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Nizhu River Hydropowe Station in Shuicheng, Guizhou,which founded in 2004 and registered capital of RMB 200 million yuan and the total investment of 800 million yuan, installed 136000 kilowatts and year power rate 1,000,000,000 kwh, has porduced the electricity generation in April 2012 and annual profits 100 million yu
问题补充:

  • 匿名
2013-05-23 12:21:38
Nizhu河Hydropowe站水城,贵州,它成立于2004年的20000万元,总投资800亿元,注册资本已安装136000千瓦和年发电量10亿千瓦时,已porduced发电2012年4月和年
  • 匿名
2013-05-23 12:23:18
Nizhu河Hydropowe驻地在水城,贵州,建立2004年和RMB的登记的资本200百万元和800百万元的总投资,在2012年4月和年赢利安装了136000千瓦和年力量率1,000,000,000 kwh, porduced电力生产100百万元。
  • 匿名
2013-05-23 12:24:58
Nizhu河Hydropowe驻地在Shuicheng,贵州,建立2004年和RMB的登记的资本200百万元和800百万元总投资,安装136000千瓦和年力量率1,000,000,000 kwh,在2012年4月和年赢利有porduced电力生产100百万元。
  • 匿名
2013-05-23 12:26:38
贵州水城,公司成立于 2004 年和注册资本人民币 2 亿人民币,总投资 8 亿人民币,Nizhu 河蛟坝电站安装 136000 千瓦和一年用电率 1000000000 千瓦时,公司出产的发电量在 2012 年 4 月和每年利润 1 亿人民币。
  • 匿名
2013-05-23 12:28:18
Nizhu 河在 Shuicheng,贵州的 Hydropowe 站,建立在 2004 年和注册 RMB 二亿元的首都和八亿元的总数的投资,安装 136000 千瓦和年的力量比率 1,000,000,000 千瓦小时, porduced 了 2012 年 4 月和年度利润的电一代一亿元。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭