求翻译:The Contractor shall provide all necessary equipment and assistance to enable the accuracy of the setting out to be checked by the Architect. Checking of the setting out shall not relieve the Contractor of his responsibility for the correctness thereof. Unless the Architect shall otherwise instruct, the Contractor shal是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall provide all necessary equipment and assistance to enable the accuracy of the setting out to be checked by the Architect. Checking of the setting out shall not relieve the Contractor of his responsibility for the correctness thereof. Unless the Architect shall otherwise instruct, the Contractor shal
问题补充:

  • 匿名
2013-05-23 12:21:38
承包商应提供所有必要的设备和援助,使该设置的准确性出由建筑师进行检查。
  • 匿名
2013-05-23 12:23:18
承包商将提供所有必要的设备和援助使能建筑师将检查的开始的准确性。检查开始不会免除承包商他的因此正确性的责任。除非建筑师将否则指示,承包商对和完全地以他自己的代价将负责改正出现从他自己不精确开始的所有错误。
  • 匿名
2013-05-23 12:24:58
承包商将提供所有必要的设备和援助使能建筑师将检查的开始的准确性。 检查开始不会免除承包商他的对因此正确性的责任。 除非建筑师将否则指示,承包商将负责对和整个地以他自己的代价改正出现从他自己不精确开始的所有错误。 如果建筑师否则指示,适当的扣除由合同价格将被做反射费用的这样错误。
  • 匿名
2013-05-23 12:26:38
承包商应提供所有必要的设备和援助,使放样的准确性进行检查由建筑师。签出设置的不应解除承包商的他对其中的正确性的责任。除非建筑师应另有指示,承包商应负责并完全自费纠正他自己不准确设置而引起的任何错误。如果建筑师另有指示,适当扣除应从合同价格以反映这种错误的成本。
  • 匿名
2013-05-23 12:28:18
承包商将提供所有必要设备和帮助外面允许设置的准确性被建筑师检查。设置的外面检查不因正确性其中将宽慰他的责任的承包商。除非建筑师否则教育,承包商将是对负责和完全以他的自己的费用更正外面源于他的自己不准确的设置的任何错误。如果建筑师否则教育,适当的扣除将由合同价格制成反映这样的错误的费用。
 
 