当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:SPU has implemented five projects to date, varying in size and scope, but all with the intended goal of protecting the integrity of local waterbodies. The projects use alterations to streets and street right-of-ways that decrease impervious surface area, slow stormwater flows, and increase infiltration.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
SPU has implemented five projects to date, varying in size and scope, but all with the intended goal of protecting the integrity of local waterbodies. The projects use alterations to streets and street right-of-ways that decrease impervious surface area, slow stormwater flows, and increase infiltration.
问题补充:

  • 匿名
2013-05-23 12:21:38
SPU已实施五个项目至今,在规模和范围不同,但都具有保护当地水体的完整性的预期目标。
  • 匿名
2013-05-23 12:23:18
SPU迄今实施了五个项目,大小不同和范围,但是所有与保护地方waterbodies正直的意欲的目标。项目使用改变到街道,并且减少不渗透的表面的街道正确方式,慢暴雨水流动和增量滤渗。
  • 匿名
2013-05-23 12:24:58
SPU迄今实施了五个项目,变化在大小和范围,但所有以保护地方waterbodies正直的意欲的目标。 项目使用改变到街道,并且减少不渗透的表面的街道正确方式,慢暴雨水流动和增量滤渗。
  • 匿名
2013-05-23 12:26:38
SPU 实施了五个项目,到目前为止,不同的大小和范围,但所有与保护当地水体的完整性的预定目标。项目使用改建的街道和街头该草减少不透水表面面积,减缓雨水流动,增加入渗。
  • 匿名
2013-05-23 12:28:18
SPU 迄今实施了五个项目,在尺码上变化和范围,但是所有以保护本地 waterbodies 的完整的预期目标。项目使用改变到减少不受影响表面的地区的街和街通行权,缓慢的 stormwater 流动,增强渗透。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭