当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Contractor shall prepare and conduct the QC Plan for all tests and inspections required in relation to all site construction activities executed by other site contractors selected by Air Products. Quality hold points of construction work in accordance with AP specifications and requirements have been identified in 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall prepare and conduct the QC Plan for all tests and inspections required in relation to all site construction activities executed by other site contractors selected by Air Products. Quality hold points of construction work in accordance with AP specifications and requirements have been identified in
问题补充:

  • 匿名
2013-05-23 12:21:38
承包商应编制和实施中有关由空气化工产品公司选择了其他网站的承建商执行的所有工地施工活动所需的所有测试和检查的质量控制计划。
  • 匿名
2013-05-23 12:23:18
承包商将准备并且举办关于所有站点建筑活动和检查的QC计划需要的所有测试执行由空气产品选择的其他站点承包商。质量举行问题的建筑工作符合AP规格和要求在附录C.被辨认了。
  • 匿名
2013-05-23 12:24:58
承包商将准备并且举办QC计划为关于所有站点建筑活动和检查需要的所有测试执行由Air选择的其他站点承包商Products。 质量举行问题的建筑工作与AP规格和要求符合在附录C.被辨认了。
  • 匿名
2013-05-23 12:26:38
承包商应做好准备,并进行所有的测试和检查所有网站建设活动由空气产品选择其他网站承建商执行所都需的质量控制计划。施工质量控制要点工作根据 AP 的规格和要求,现已在附录 C 中。
  • 匿名
2013-05-23 12:28:18
承包商将准备和进行有关与被其他地点承包商执行的所有地点建造活动有关需要的所有测试和检验的 QC 计划选择在空气产品旁边。高级控制按照 AP 规格和需求建造工作的指在附录中被标识了 C.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭