当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:8.1, Earing levels and direction at final gauge must have an acceptable variation to Hulamin's customer's tooling requirements for the manufacture of can end shells. This requirement presupposes that standard, established cold reductions, temperature generation and cooling procedures have been followed.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
8.1, Earing levels and direction at final gauge must have an acceptable variation to Hulamin's customer's tooling requirements for the manufacture of can end shells. This requirement presupposes that standard, established cold reductions, temperature generation and cooling procedures have been followed.
问题补充:

  • 匿名
2013-05-23 12:21:38
8.1 ,耳钉在最终计的水平和方向,必须有一个可以接受的变化,以Hulamin的客户模具要求,可最终弹的制造。
  • 匿名
2013-05-23 12:23:18
8.1, Earing水平和方向在最后的测量仪必须有可接受的变异到Hulamin的顾客的凿出的装饰要求的罐头末端壳制造。这个要求预料标准,建立的冷的减少,温度一代和冷却做法被仿效。
  • 匿名
2013-05-23 12:24:58
8.1, Earing水平和方向在最后的测量仪必须有可接受的变异到Hulamin的顾客的罐头末端壳制造的凿出的装饰要求。 这个要求预料标准,建立的冷的减少,温度世代和冷却规程被跟随了。
  • 匿名
2013-05-23 12:26:38
8.1,抽穗的水平和方向在最后计必须有可接受的变化,以 Hulamin 的客户模具制造的要求可以结束的贝壳。这项规定为前提采用了标准,制定冷裁减、 温度一代和冷却程序。
  • 匿名
2013-05-23 12:28:18
8.1, Earing 最后量规的水平和方向必须有可接受的变化跟 Hulamin 的客户在用工具加工制作的要求可以终止壳。这个要求预先假定标准,被建立的冷漠的缩减,温度的一代和冷却的程序被沿着了。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭