当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The objective of this study was to investigate the relationship between pavement distresses as performance indicators, pavement condition indices, and the effective structural number of in-service pavements calculated from FWD testing. To achieve this objective, 50 pavement sections were tested in Louisiana using FWD t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The objective of this study was to investigate the relationship between pavement distresses as performance indicators, pavement condition indices, and the effective structural number of in-service pavements calculated from FWD testing. To achieve this objective, 50 pavement sections were tested in Louisiana using FWD t
问题补充:

  • 匿名
2013-05-23 12:21:38
本研究的目的是调查路面之间的关系困扰的性能指标,路面状况指数,并在服务的路面从正向测试计算出的有效结构数。
  • 匿名
2013-05-23 12:23:18
这项研究宗旨将调查路面之间的关系困厄当业绩指标、路面情况索引和从FWD测试计算的在职路面的有效的结构数量。要达到这个目标, 50个路面部分在路易斯安那被测试使用FWD估计他们的结构容量。基于这分析的结果,也许总结以下结论:
  • 匿名
2013-05-23 12:24:58
这项研究宗旨将调查路面之间的关系困厄当业绩指标、路面情况索引和从FWD测试计算的在职路面的有效的结构数量。 要达到这个目标, 50个路面部分在路易斯安那被测试使用FWD估计他们的结构容量。 基于这分析的结果,也许总结以下结论:
  • 匿名
2013-05-23 12:26:38
本研究的目的是探讨作为性能指标,路面病害之间的关系从 FWD 检测路面状况指数,在职人行道的有效结构数目计算。为了实现这一目标,50 路段路面分别在路易斯安那州使用 FWD,以评估其结构的能力测试。基于这一分析结果,可以得出以下结论:
  • 匿名
2013-05-23 12:28:18
这项研究的目标是调查人行道之间的关系悲痛作为表现指标,人行道条件指数,以及在职人行道的有效结构的数字从 FWD 测试计算。达到这目标, 50 人行道部分使用 FWD 在路易斯安那被测试评估他们的结构的能力。根据这种分析的结果,以下结论可能被画:
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭