当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:31.16 Provided that where a nominated sub-contractor terminates the sub-contract as a result of a default by the Contractor, or the Contractor terminates the sub-contract without the written advice of the Architect, the Contractor shall be liable to the Employer for any additional costs arising therefrom.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
31.16 Provided that where a nominated sub-contractor terminates the sub-contract as a result of a default by the Contractor, or the Contractor terminates the sub-contract without the written advice of the Architect, the Contractor shall be liable to the Employer for any additional costs arising therefrom.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
31.16 在一位被提名的转承包商终止转包由于缺省由承包商的地方条件下,或者承包商终止转包,不用建筑师的书面忠告,承包商将是有义务的对雇主为所有另外的费用升起从那里。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭