求翻译:The Tanjung Bin power plant is to be commissioned in 2016. Combined with the new Manjung power plant also being constructed by Alstom and due to come online in 2015, the power plants will jointly provide an additional capacity of 2000 MW for Peninsular Malaysia. The Tanjung Bin power plant is Alstom’s second contract f是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Tanjung Bin power plant is to be commissioned in 2016. Combined with the new Manjung power plant also being constructed by Alstom and due to come online in 2015, the power plants will jointly provide an additional capacity of 2000 MW for Peninsular Malaysia. The Tanjung Bin power plant is Alstom’s second contract f
问题补充:

  • 匿名
2013-05-23 12:21:38
丹绒宾发电厂被委托在2016年结合也正在由阿尔斯通建造,并且由于在2015年联机新曼绒发电厂,该发电厂将联合提供2000兆瓦的马来西亚半岛的额外容量。
  • 匿名
2013-05-23 12:23:18
丹戎容器能源厂将在2016年被委任。与阿尔斯通也被修建的新的曼绒市能源厂结合和交付在网上在2015年来,能源厂为马来西亚半岛将共同地提供2000兆瓦附加容量。丹戎容器能源厂是一个超临界燃煤单位的阿尔斯通的第二合同在马来西亚,跟随命令在2011年3月修造1000兆瓦曼绒市能源厂。
  • 匿名
2013-05-23 12:24:58
2016年Tanjung容器能源厂将被委任。 与Alstom也被修建的新的Manjung能源厂结合和交付在2015年内上网,能源厂为马来西亚半岛将联合提供附加容量2000兆瓦。 Tanjung容器能源厂是Alstom的第二合同为一个超临界燃煤单位在马来西亚,跟随命令修造1000兆瓦Manjung能源厂在2011年3月。
  • 匿名
2013-05-23 12:26:38
丹绒宾电厂是在 2016 年委托。结合新绒电厂也正在建造的阿尔斯通和截止来,网上到 2015 年,发电厂将联合提供为马来西亚半岛的一个额外的容量为 2000年兆瓦。丹绒宾电厂是阿尔斯通的超临界燃煤机组在马来西亚,跟踪订单打造 1000年兆瓦绒电厂在 2011 年 3 月第二个合同。
  • 匿名
2013-05-23 12:28:18
Tanjung 仓库发电厂是在 2016 年被委托。也被与新 Manjung 发电厂结合起来被 Alstom 建造和即将在线在 2015 年来,发电厂联合地将提供 2000 MW 的一种其他的能力用于半岛的马来西亚。Tanjung 仓库发电厂是 Alstom 的第二合同超对至关重要在马来西亚的煤炭点燃的单位,随着建造 1000 MW 座 Manjung 发电厂于 2011 年 3 月的次序。
 
 