|
关注:1
2013-05-23 12:21
求翻译:The test shall be carried out at –25°C. A 1 kg ball falls from a height of 1m onto the fixed test specimen. The component is on its support points on a metal plate. The impact is therefore applied to the side of the component that is on the outside when in its installation position.The areas to be checked shall be coor是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The test shall be carried out at –25°C. A 1 kg ball falls from a height of 1m onto the fixed test specimen. The component is on its support points on a metal plate. The impact is therefore applied to the side of the component that is on the outside when in its installation position.The areas to be checked shall be coor
问题补充: |
|
2013-05-23 12:21:38
试验应进行在-25℃ 。
|
|
2013-05-23 12:23:18
测试将进行在– 25°C。一个1 kg球从高度1m落在固定的测试标本上。组分在它的在金属片的支持点。因此冲击被申请于在外部,当在它的安装位置时组分的边。将被检查的区域将协调与组分经理。当吸湿
|
|
2013-05-23 12:24:58
测试将被执行在- 25°C。 一个1公斤球从高度1m落固定的测试标本。 组分在它的支持点在金属片。 因此冲击被申请于在外部,当在它的设施位置时组分的边。将被检查的区域将协调与组分经理。 当吸湿
|
|
2013-05-23 12:26:38
测试应在-25 ° c。1 公斤球从 1 米到固定的测试样品的高度落下。该组件是对它的支持点在金属板上。影响因此适用于的一侧是在外面的时候在其安装位置的组件。要检查的领域应当与组件管理器相协调。当吸湿
|
|
2013-05-23 12:28:18
测试将被进行在 - 25 ° C。1 公斤的球从往固定测试样本上一百万的一个高度中降低。组件在其支持上在一个金属盘子上指。影响因此被应用到在其安装中的外部的组件的边有待检查的 position.The 地区跟组成经理一起将是协调的。当吸湿
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区