|
关注:1
2013-05-23 12:21
求翻译:The damages claimed by the Plaintiff as a result of the Defendant’s failure to pay in breach of the Contract is therefore RMB¥52,370,172 (i.e., RMB¥182,752,800 less RMB¥4,097,200 less RMB¥55,280,800 less RMB¥71,004,628).是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The damages claimed by the Plaintiff as a result of the Defendant’s failure to pay in breach of the Contract is therefore RMB¥52,370,172 (i.e., RMB¥182,752,800 less RMB¥4,097,200 less RMB¥55,280,800 less RMB¥71,004,628).
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区