当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:SGT Suzhou is planning to increase 1600KVA power supply for plant operation. Currently, SGT plant 1 already has one incoming power cable from power bureau; this line carries the 2850 KVA power capacity for SGT. SGT wants to apply new incoming cable to carry new 1600KVA power capacity for plant operation. After that, S是什么意思?

待解决 悬赏分:1 - 离问题结束还有
SGT Suzhou is planning to increase 1600KVA power supply for plant operation. Currently, SGT plant 1 already has one incoming power cable from power bureau; this line carries the 2850 KVA power capacity for SGT. SGT wants to apply new incoming cable to carry new 1600KVA power capacity for plant operation. After that, S
问题补充:

  • 匿名
2013-05-23 12:21:38
北京时间苏州正计划增加对工厂操作1600KVA供电。
  • 匿名
2013-05-23 12:23:18
SGT苏州计划为工厂运转增加1600KVA电源。目前, SGT植物1已经有从力量局的一接踵而来的电缆;这条线运载SGT军士的2850 KVA发电能力要应用新的接踵而来的缆绳运载工厂运转的新的1600KVA发电能力。在那以后, SGT植物1将有哺养从力量局的双重圈电源,并且共计发电能力将是4450KVA。
  • 匿名
2013-05-23 12:24:58
SGT Suzhou计划为工厂运转增加1600KVA电源。 当前, SGT植物1已经有一接踵而来的电缆从力量局; 这条线运载2850 KVA功率电容为军士。 SGT想要应用新的接踵而来的缆绳运载新的1600KVA功率电容为工厂运转。 在那以后, SGT植物1将有双重圈电源哺养从力量局,并且共计功率电容将是4450KVA。
  • 匿名
2013-05-23 12:26:38
SGT 苏州正计划增加 1600KVA 电源的工厂运行。目前,上士植物 1 已经有一个传入电力电缆从电力工业局 ;这条线进行 2850 KVA 电源容量为军士。SGT 想要申请新的传入电缆进行工厂运营新 1600KVA 电源容量。在那之后,上士植物 1 将从电力工业局,饲喂的双回路电源供应和总功率能力,将是 4450KVA。
  • 匿名
2013-05-23 12:28:18
Suzhou 警官在计划为工厂操作增强 1600KVA 电源。当前,警官植物 1 已从力量局有一根进来的力量电缆;这条线为陆军中士具有 2850 KVA 种力量能力警官想应用新进来的电缆为工厂操作具有新 1600KVA 力量能力。此后,警官植物 1 从力量局将有两倍的圈电源喂养,总共力量能力将是 4450KVA。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭