|
关注:1
2013-05-23 12:21
求翻译:3.2.3. After final solution and cost confirmed by SGT, supplier will be responsible for finding qualified company to design external construction, incoming cable, internal transformer system, transformer room (if necessary), and related fire protection system design.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
3.2.3. After final solution and cost confirmed by SGT, supplier will be responsible for finding qualified company to design external construction, incoming cable, internal transformer system, transformer room (if necessary), and related fire protection system design.
问题补充: |
|
2013-05-23 12:21:38
3.2.3 。
|
|
2013-05-23 12:23:18
3.2.3.\t在最后的SGT证实的解答和费用以后,供应商负责找到合格的公司设计外在建筑、接踵而来的缆绳、内部变压器系统、变压器室(如果需要)和相关的防火系统设计。
|
|
2013-05-23 12:24:58
3.2.3. 在最后的SGT证实的解答和费用以后,供应商负责找到具有资格的公司如果需要设计外在建筑、接踵而来的缆绳、内部变压器系统、变压器 (室)和相关的防火系统设计。
|
|
2013-05-23 12:26:38
3.2.3.后最终的解决方案和费用由 SGT 确认,供应商将负责寻找合格的公司,以设计外部建设,进线电缆,变压器内部系统,变压器室 (如果必要),和相关的消防系统设计。
|
|
2013-05-23 12:28:18
3.2.3.在被确认的最后解决方案和损失之后所作警官,供应商将负责发现有资格的公司设计外部建造,进来的电缆, 内部跨前系统,跨前房间 ( 如有必要 ),使防火系统设计相联系。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区