求翻译:3.2.5. After get approval from power bureau and fire bureau, supplier will be responsible for all external construction and incoming cable installation, connection; internal transformer room construction, cable trench construction and cable tray installation, and electrical equipment purchasing.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
3.2.5. After get approval from power bureau and fire bureau, supplier will be responsible for all external construction and incoming cable installation, connection; internal transformer room construction, cable trench construction and cable tray installation, and electrical equipment purchasing.
问题补充:

  • 匿名
2013-05-23 12:21:38
3.2.5 。
  • 匿名
2013-05-23 12:23:18
3.2.5.\t以后从力量局得到认同,并且火局,供应商对所有外在建筑和接踵而来的电缆安装,连接将负责;内部变压器室建筑、缆绳沟槽建筑和电缆托盘设施和电机设备购买。
  • 匿名
2013-05-23 12:24:58
3.2.5. 以后从力量局得到认同,并且火局,供应商将负责对所有外在建筑和接踵而来的电缆安装,连接; 内部变压器室建筑、缆绳沟槽建筑和缆绳盘子设施和电机设备购买。
  • 匿名
2013-05-23 12:26:38
3.2.5.得到审批后从电力工业局和消防局,供应商将会负责所有的外部建设和传入电缆安装、 连接 ;内部变压器室施工、 电缆沟施工和电缆桥架安装和电气设备的采购。
  • 匿名
2013-05-23 12:28:18
3.2.5.后面从力量局和火局获取审批,供应商将对所有外部建造和进来的电缆安装,连接负责;内部跨前房间建造,电缆槽建造和电缆碟子安装,购买的电源设备。
 
 