当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The pump house of a coastal power plant, adopting a direct current water intake system, is located near the sea, with features of bulky volume, large embedded depth, complex design loads and difficult construction. Pump houses of the Shenzhen Eastern power plant were constructed by floating the caisson. Each caisson we是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The pump house of a coastal power plant, adopting a direct current water intake system, is located near the sea, with features of bulky volume, large embedded depth, complex design loads and difficult construction. Pump houses of the Shenzhen Eastern power plant were constructed by floating the caisson. Each caisson we
问题补充:

  • 匿名
2013-05-23 12:21:38
泵房沿海电厂,采用直流引水系统,靠近海边,拥有庞大的体积,大埋深,复杂的设计荷载和施工难度大的特点。
  • 匿名
2013-05-23 12:23:18
一个沿海能源厂的水泵房,采取一个直流电水摄入系统,在海附近位于,有庞大的容量、大嵌入深度、复杂设计荷载和困难的建筑特点的。深圳东部能源厂的水泵房通过漂浮储气装置修建。每种储气装置称5000吨并且是30.1米长, 19.2米宽和10.6米高。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
沿海电厂,采用直流水进气系统,水泵房坐落在海边,与体积庞大的体积、 大埋的深、 复杂的设计荷载和施工难度大的特点。深圳东部电厂泵房建造了浮动沉箱。每个沉箱重达 5000 吨,是 30.1 米长,19.2 米宽,和高 10.6 米。在专门的码头沉箱预制施工后,其中一个被拖到半潜驳用安全气囊。它然后运送到指定地点潜水,浮动后安装到的位置。从码头到半潜驳航运这种大型沉箱在中国是罕见。此外,它可扩大的设计思想,提供其他大型泵房子滨海电厂的施工新方法。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭