当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Completeness of the information provided should be confirmed by QPEC in kick off meeting protocol after which any delay of PDP development work is not allowed. Need to refine, re-work or change the time-frame for developing the PDP shall be determined in accordance with the terms of the Contract是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Completeness of the information provided should be confirmed by QPEC in kick off meeting protocol after which any delay of PDP development work is not allowed. Need to refine, re-work or change the time-frame for developing the PDP shall be determined in accordance with the terms of the Contract
问题补充:

  • 匿名
2013-05-23 12:21:38
提供的信息的完整性应QPEC在打完折后是不允许的PDP研发工作的任何延迟会议的协议进行确认。
  • 匿名
2013-05-23 12:23:18
应该由QPEC证实被提供的信息的完整性起动遇见协议,在后PDP开发工作任何延迟没有允许。需要提炼,整顿或改变开发的PDP期限将是坚定的符合合同期限
  • 匿名
2013-05-23 12:24:58
应该由QPEC证实被提供的信息的完整性踢遇见协议,在之后PDP开发工作任何延迟没有允许。 需要提炼,整顿或改变期限为开发PDP将是坚定的与合同期限符合
  • 匿名
2013-05-23 12:26:38
所提供的资料的完整性应证实 QPEC,在踢掉会议的协议后,任何延误的 PDP 发展工作不允许的。需要细化、 重新工作或更改时间框架为开发 PDP 应按照合同的条款确定
  • 匿名
2013-05-23 12:28:18
被提供的信息的完全应该被 QPEC 确认在开始在其之后任何耽搁时间的 PDP 发展工作不被允许的开会协议。需要优化,重新工作或为了发展 PDP 改变时间范围将按照合同的条款被确定
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭