当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Range of operation for the block (unit) 600 is determined by the nominal capacity of the finishing line, taking into account the time required for process purges, preventive maintenance overhaul and time for re-conversion to another rubber grade production, as well as rated capacity loss index (in NBR)是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Range of operation for the block (unit) 600 is determined by the nominal capacity of the finishing line, taking into account the time required for process purges, preventive maintenance overhaul and time for re-conversion to another rubber grade production, as well as rated capacity loss index (in NBR)
问题补充:

  • 匿名
2013-05-23 12:21:38
操作的块(单元)600的范围由终点线的标称容量决定,考虑到所需的工艺清洗,预防性维护检修和时间,以便重新转换为另一种橡胶级的生产中,时间以及额定
  • 匿名
2013-05-23 12:23:18
操作的范围块(单位) 600的取决于终点线的有名无实的容量,考虑到为处理清除的需时,定期检修检修和时刻的恢复原状对另一橡胶成绩生产,以及对估计的容量损失索引(在NBR)
  • 匿名
2013-05-23 12:24:58
操作的范围为块 (单位) 600在NBR取决于终点线的有名无实的容量,考虑到为处理清除的需时,定期检修检修和时间为恢复原状到另一橡胶成绩生产,以及对估计的容量 (损失索引)
  • 匿名
2013-05-23 12:26:38
通过终点线的标称容量确定的 (单位) 600 块的操作范围,考虑到过程所需的时间清除,预防性维护检修和时间重新转换为另一种橡胶级生产,以及额定容量损失指标 (在 NBR)
  • 匿名
2013-05-23 12:28:18
对于街区的系列操作 ( 单位 )600 被结束线的名义能力确定,考虑为过程需要的时间清洗,预防性维护彻底改造和到另一批橡胶等级生产的重新转换的时间,以及额定能力损失指数 ( 在 NBR 中 )
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭