当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The regulator, if used under the condition of 9.1.2 item (a), would need to be tested because the longer distance of wiring could affect conformance with the specifications. Also, there maybe more than one test station connected to the branch circuit and, therefore, parallel connection of loads at the same time that ma是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The regulator, if used under the condition of 9.1.2 item (a), would need to be tested because the longer distance of wiring could affect conformance with the specifications. Also, there maybe more than one test station connected to the branch circuit and, therefore, parallel connection of loads at the same time that ma
问题补充:

  • 匿名
2013-05-23 12:21:38
该调节器中,如果9.1.2 (a)项的条件下使用时,就需要进行测试,因为布线的较长距离可能影响符合规格。
  • 匿名
2013-05-23 12:23:18
因为长途接线可能影响与规格的依照管理者,若被采用在9.1.2项目下(a)的情况,将需要被测试。并且,同时可以需要被考虑到,那里超过一个测试站可能连接了到装载的分支电路,并且,因此,并联。
  • 匿名
2013-05-23 12:24:58
管理者,如果在9.1.2项目下使用a的情况 (),将需要被测试,因为更长的距离接线可能影响依照以规格。 并且,同时可以需要被考虑到,那里超过一个测试站可能连接了到装载的分支电路,并且,因此,并联。
  • 匿名
2013-05-23 12:26:38
稳压器,如果使用 9.1.2 条件下项目 (a),并将需要测试,因为更长的距离的布线可能会影响符合规范。此外,那里也许不止一个测试工作站连接到分支电路和,因此,并联连接的负荷在同一时间,可能需要考虑到。
  • 匿名
2013-05-23 12:28:18
管理者,如果使用在 9.1.2 条款 (a) 的条件下,会需要被测试因为配线的更长距离以规格可以影响一致性。另外,或许在那里连接到分支电路的超过一个测试站;因此,在可能需要被考虑的同时的负荷的平行连接。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭