|
关注:1
2013-05-23 12:21
求翻译:samples shall be mounted to cover the wall frames full height out to 6.1m from the corner created by the intersection of the sample and half height from the ceiling down from 6.1m out to 11.58 on the south wall and 15.24m on the east wall 16mm thick gypsum wall board shall be mounted to cover the remaining lower sectio是什么意思? 待解决
悬赏分:1
- 离问题结束还有
samples shall be mounted to cover the wall frames full height out to 6.1m from the corner created by the intersection of the sample and half height from the ceiling down from 6.1m out to 11.58 on the south wall and 15.24m on the east wall 16mm thick gypsum wall board shall be mounted to cover the remaining lower sectio
问题补充: |
|
2013-05-23 12:21:38
样品应当被安装成覆盖所述壁架全高度,将其从由该样品的交叉点与半高度从天花板从6.1米倒在南壁和15.24米在东壁16毫米创造出11.58角落6.1米
|
|
2013-05-23 12:23:18
样品将登上报道墙壁框架充分的高度到6.1m从样品的交叉点创造的角落,并且从天花板的半高度下来从6.1m到11.58在南墙壁上和15.24m在东部墙壁16mm厚实的石膏墙壁板将登上包括两墙壁的剩余的更低的部分
|
|
2013-05-23 12:24:58
样品将登上报道墙壁框架充分的高度到6.1m从样品的交叉点创造的角落,并且半高度从天花板下来从6.1m到11.58在南墙壁上和15.24m在东部墙壁16mm厚实的石膏墙壁板将登上包括两墙壁的剩余的更低的部分
|
|
2013-05-23 12:26:38
样本应安装覆盖墙框架充分的高度出到 6.1 m 从角落里由样品的交叉和应安装从天花板下来从出 6.1 m 至 11.58 南面墙上和东壁 16 毫米厚厚的石膏墙板上 15.24 m 高度的一半,以支付剩余的较低部分的两边墙上
|
|
2013-05-23 12:28:18
采样将被登上完全包括墙框架高度外面到来自被例子的十字路口创建的角落的六百一十万和半高度从天花板跟关于东方墙关于南方墙和一千五百二十四万的 11.58 外面从六百一十万下跌 16 毫米厚的石膏墙董事会将被登上包括墙的剩余更低的部分
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区