当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2. PSU failure has been identified as a key improvement, and INOVA has worked closely with the BGP team and have accepted over 196 improvements in the G3i system as a result of this collaboration. INOVA has an improved reliability design that has been implemented and will be in all future systems supplied to BGP. INOVA是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2. PSU failure has been identified as a key improvement, and INOVA has worked closely with the BGP team and have accepted over 196 improvements in the G3i system as a result of this collaboration. INOVA has an improved reliability design that has been implemented and will be in all future systems supplied to BGP. INOVA
问题补充:

  • 匿名
2013-05-23 12:21:38
2,电源故障已被确定为重点整治,并INOVA已经与BGP的团队紧密合作,并已接受了196改进的G3i系统作为这项合作的结果。
  • 匿名
2013-05-23 12:23:18
2. PSU失败被辨认了作为关键改善,由于这合作,并且INOVA严密地与BGP队一起使用和接受了在G3i系统的196改善。INOVA有被实施了和在所有未来系统被提供给BGP的一个被改进的可靠性设计。INOVA为现有的PSU'S也提供一些附加步骤改进在领域的可靠性。
  • 匿名
2013-05-23 12:24:58
2. PSU失败被辨认了作为关键改善,并且INOVA严密运作与BGP队和接受了在G3i系统的196改善由于这合作。 INOVA有被实施了的一个被改进的可靠性设计和在所有未来系统被提供给BGP。 INOVA为现有的PSU'S在领域也提供一些另外的步改进可靠性。
  • 匿名
2013-05-23 12:26:38
2.PSU 失败已被确定为关键技术的改进和 INOVA 与 BGP 团队密切合作,已接受超过 196 改进 G3i 系统由于这种合作。INOVA 具有改进的可靠性设计,已到了,将会在今后所有的系统提供给 BGP。INOVA 还提供了一些额外的步骤,为现有 PSU 的提高可靠性领域。
  • 匿名
2013-05-23 12:28:18
2.PSU 故障被认出是了主要改进, INOVA 与 BGP 小组紧密合作了和由于这项合作接受了在 G3i 系统中的超过 196 改进。INOVA 有被实施了,并将在提供被给 BGP 的所有将来系统中的一个被改善的可靠性设计。INOVA 也提供一些其他的步骤用于了现有 PSU 是在田地改善可靠性。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭