当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:include flex section. leave 15mm from each point 2 and 1, then flare the tube and install flexible tubing. The flexible section is 95mm long with about 10 mm of overlap with the tube on each end. this makes the part length from point 0 to 5 about 10 mm longer in the Z direction. Crimp hose onto hard section. Internal t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
include flex section. leave 15mm from each point 2 and 1, then flare the tube and install flexible tubing. The flexible section is 95mm long with about 10 mm of overlap with the tube on each end. this makes the part length from point 0 to 5 about 10 mm longer in the Z direction. Crimp hose onto hard section. Internal t
问题补充:

  • 匿名
2013-05-23 12:21:38
包括弯曲部分。
  • 匿名
2013-05-23 12:23:18
包括导电线部分。留下15mm从每点2和1,然后飘动管并且安装灵活的管材。灵活的部分长期是95mm与大约10 mm与管的交叠在每个末端。这由点做零件长度0到5大约10 mm更长在Z方向。起皱在坚硬部分上的水管。临时雇员最大250F。流体是蓄冷剂。外在临时雇员最大400F
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
包括伸缩节。从每个点 2 和 1,离开 15 毫米然后 flare 管和安装挠性管。灵活部分是 95 毫米长,约 10 毫米的重叠与在每个月底管。这使得部分的长度从 0 到 5 约 10 毫米长点在 Z 方向。卷曲到硬节上的软管。内部临时 max 250F。流体是冷却剂。外部临时 max 400F
  • 匿名
2013-05-23 12:28:18
包括导电线部分。 事假15mm从每点2和1,然后飘动管并且安装灵活的管材。 灵活的部分长期是95mm以大约10毫米交叠用管在每个末端。 这由点做零件长度0到5大约10毫米更长在Z方向。 起皱水喉坚硬部分。 內在临时雇员最大250F。 流体是蓄冷剂。 外在临时雇员最大400F
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭