当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Out before and after the first vertical plate, then use bearing a top-down vertical plate before and after the set into the bearing type iron bar positioning on the bottom of the frame. (please click on each floor when put bearing of the positioning of the average place bearing entries after put battery)是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Out before and after the first vertical plate, then use bearing a top-down vertical plate before and after the set into the bearing type iron bar positioning on the bottom of the frame. (please click on each floor when put bearing of the positioning of the average place bearing entries after put battery)
问题补充:

  • 匿名
2013-05-23 12:21:38
出之前和第一垂直板后,再使用之前和集成在框架底部的轴承类型铁棒定位后轴承自上而下的垂直板。
  • 匿名
2013-05-23 12:23:18
在第一块垂直的板材前后,然后使用负担一块自上而下的垂直的板材在集合前后入轴承类型安置在框架的底部的钢棍。(请点击每个地板,当安置的被投入的轴承平均地方轴承词条在被投入的电池以后)
  • 匿名
2013-05-23 12:24:58
在第一块垂直的板材前后,然后使用负担一块自上而下的垂直的板材在集合前后入轴承类型安置在框架的底部的钢棍。 (请点击每个地板,当安置的被投入的轴承平均地方轴承词条在被投入的电池以后)
  • 匿名
2013-05-23 12:26:38
出去之前和之后第一次垂直板,然后使用轴承自上而下的垂直板之前和之后入轴承类型铁栏定位在底部的框架集。(请点击每一层楼,当把轴承的轴承的条目后放电池的平均地方的定位)
  • 匿名
2013-05-23 12:28:18
外面在第一垂直盘子之前和之后,然后使用举止在进到在框架的底部上的承重的类型铁酒吧定位的套之前和之后的一个自上而下进行垂直盘子。( 请单击是提出平均地方举止进入的定位的举止时的每块地板后面提出电池 )
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭