当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Before sending ERP samples to LCIE, we Provac arranged inner ERP test. Before inner test, the metal bar for hard floor dpu was deformed which was not detected. The floor brush base was distorted because after inner test owing to deformed metal bar. Attached is deformed floor brush base and metal bar pics.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Before sending ERP samples to LCIE, we Provac arranged inner ERP test. Before inner test, the metal bar for hard floor dpu was deformed which was not detected. The floor brush base was distorted because after inner test owing to deformed metal bar. Attached is deformed floor brush base and metal bar pics.
问题补充:

  • 匿名
2013-05-23 12:21:38
在发送的ERP样品LCIE ,我们Provac安排内部ERP系统的测试。
  • 匿名
2013-05-23 12:23:18
在送ERP样品前到LCIE,我们Provac安排了内在ERP测试。在内在测试前,未查出的坚硬地板的dpu金属棒被扭屈了。地刷基地由于被扭屈的金属棒被变形了,因为在内在测试以后。附上被扭屈的地刷基地和金属棒pics。
  • 匿名
2013-05-23 12:24:58
在寄发ERP样品之前到LCIE,我们Provac被安排的内在ERP测试。 在内在测试之前,金属棒为未被查出的坚硬地板dpu被扭屈了。 地板刷子基地由于被扭屈的金属棒被变形了,因为在内在测试以后。 附上被扭屈的地板刷子基地和金属棒pics。
  • 匿名
2013-05-23 12:26:38
在将 ERP 样品送至 LCIE 之前, 我们 Provac 安排内部 ERP 测试。内部测试前,坚硬的地板上 dpu 的金属栏被变形,未检测到。地板刷基地被扭曲,因为后内部测试由于变形金属棒。附件是变形的地板刷基地和金属酒吧的照片。
  • 匿名
2013-05-23 12:28:18
在向 LCIE 寄给 ERP 例子之前,我们 Provac 安排内部 ERP 测试。在内部测试之前,对于困难的地板的金属条 dpu 被变形那没有被检测。地板灌木丛基础由于畸形的金属条在内部测试之后被扭曲。附加是畸形的地板灌木丛基础和金属条照片。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭